cement mill,cement clinker grinding plant

cement mill,cement clinker grinding plant

Cement clinker is usually ground using a cement ball mill. This is essentially a large rotating drum containing grinding media - normally steel balls. As the drum rotates, the motion of the balls crushes the clinker. The drum rotates approximately once every couple of seconds.

Grinding systems are either 'open circuit' or 'closed circuit'. In an open circuit system, the feed rate of incoming clinker is adjusted to achieve the desired fineness of the product. In a closed circuit system, coarse particles are separated from the finer product and returned for further grinding.

This cement ball mill is mainly used in grinding cement finished products and raw materials and also suited to metallurgical, chemical, electricity etc. and other industrial mining enterprises. It could also be used to grind various ore materials and materials that is grindability.

Cement mill is a simplified level, out of the hollow shaft and grinding materials and other components, simplified for the long cylinder, cylinder equipped with a grinding, cylinder of steel plate, with steel liner and simplified fixed, grinding media generally steel ball, according to different tube diameters and a certain percentage of load in, section steel grinding media can also be used.

When the cylinder rotates, the material and the ball under the action of centrifugal force, close to the liner, due to the role of friction, the material and the ball into the cylinder a certain height, the gravity, the ball and materials while whereabouts of the ball crushing the material, while the relative liner material sliding friction occurs, the resulting abrasive material, grinding the material so as to achieve the purpose.

Material by the feeding device into the compound air evenly into the mill screw shaft first warehouse, the warehouse there are ladder liner or corrugated liner, built with different specifications steel ball, rotating cylinder produces centrifugal force to the ball a certain height After the fall, have severe impact on the material and abrasive. Coarse material in the first position to reach, after single-compartment plate into the second warehouse, the warehouse lined with flat lining, there are balls, the material to further grinding. Powder discharged through the discharge grate plate, complete the grinding operation.

Cylinder in the rotary process, the grinding phenomenon has slipped in the fall to the process of abrasive material in order to effectively use abrasive effect on the larger particle size is generally twenty head when finely ground, the body tube mill body with the diaphragm plate separated Sec, it becomes two-position, materials into the first position when the ball was crushed, the material into the second position when the end of the material for grinding steel, finely ground material passing from the discharge end of the discharge hollow shaft, the small particles of feed material for pulverized, as in II slag sand, coarse fly ash, mill shell could have no partitions, a single-chamber tube mill, grinding the volume of steel can also be segment.

cement mill,cement mills,cement ball mill,cement grinding mill,cement grinding machine - hxjq mining machine manufacturer

cement mill,cement mills,cement ball mill,cement grinding mill,cement grinding machine - hxjq mining machine manufacturer

In the cement production line, we use cement crusher for cement crushing process, then we need cement mill for fine grinding stage. As a kind of cement grinding machine, Cement mill is the equipment used for grinding the hard , nodular clinker from the cement kiln into the fine grey powder that is cement.

Its main function lies in grinding cement clinker (and gelling agent, performance adjusting grinding materials) into suitable particles (by fineness and specific surface area, etc), to form certain particle gradation, increasing its hydration area, accelerating the hydration speed, satisfying the slurry condensation and hardening requirements.

Henan Hongxing Mining Machinery Co., Ltd. is a professional manufacturer of full sets mining equipment including cement mills, stone production line, sand making production line and so on. Besides, we offer the most favorable cement mill price.

Cement ball mill is not only suitable for over-flow grinding, but also applicable for cyclic close-flow grinding together with powder collector. The opportunities and challenges of the cement mill industry co-exsit today, although the overall size of milling machinery manufacturing industry has entered the ranks of the international producing countries, the overall competitiveness and development potential still can't compete with the developed countries. The current domestic high-end users and the basic components for products export mainly rely on imports.

This economic stimulus policy of development can avoid the economic crisis waves, and it makes the development of China's economy and the GDP stabilizing increase steadily. Some basic road and bridge construction of public facilities will bring significant step into the cement ball mill industry which makes cement ball mill industry usher in a new 'spring'. Therefore, the development of cement mill in the future should focus on the revitalization of basic technology and infrastructure components to raise the level of independent development.

ball mill for sale | mining and cement milling equipment

ball mill for sale | mining and cement milling equipment

Anyang General International Co., Ltd. (AGICO Group) is a ball mills supplier. Our company is mainly engaged in the development, design, manufacture, installation and commissioning of various mining and cement milling equipment and a complete set of the industrial grinding line. AGICO Group was founded in 1997, registered capital 81.34 million yuan, covers an area of 66,000 square meters, has nearly 30,000 square meters of factory buildings and more than 150 sets of various production and processing equipment.

With more than 20 years of experience in the manufacturing and research of mineral and cement milling equipment, AGICO has more than 50 technical patents. All of our ball mills, vertical roller mill, rod mill and AG/SAG mill have passed the ISO9001 international quality system certification.

The ball mill has a vital role in the cement manufacturing process. The mixed raw materials (cement raw meal) before cement production and the finished products (cement clinker) after cement manufacture need to be ground by cement ball mill. The grinding media balls in the ball mill are used in cement plant to help grind blocky or granular grindable materials produced in the cement manufacturing process, so as to achieve the effect of grinding. Vertical roller mill(VRM) and clinker grinding mill and other cement grinding mill are also very common in cement plant.

Various ball mill machines, vertical roller mills and sag mills are widely used in the mining industry. Grate ball mills and raw mills are mostly used for mineral processing in some enterprises of mining industries. Wet ball mill and rod mill are commonly used in mineral processing production line, to grind various hardness ore materials. Customers who need to grind iron ore, siderite, marble, kaolin, mica, feldspar and other ores have chosen our mineral grinding machine.

AGICO uses the latest clean coal technology to create a professional pulverized coal ball mill. Coal mill can grind pulverized coal with different fineness requirements, with high fineness and large output, which can meet the needs of large pulverized coal projects. Coal mill is often used in thermal power plant, cement plant, coal fire power plants, etc. We grind large pieces of coal into pulverized coal, which produces more energy when burned. Therefore, the rotary kilns, boilers and other kiln equipment in these large factories usually use pulverized coal as fuel.

Efficient and energy-saving ball mill, intermittent ball mill, ceramic ball mill, rod ball mill. These types of ball mills can crush materials with different attributes. It is widely used in silicate products, new building materials, refractories, fertilizers, ferrous and non-ferrous metal smelting, glass ceramics and other production industries. Vertical mill, Raymond mill, ring roller mill which divided by different grinding methods can also be used for the production of phosphor powder, nano materials, zinc oxide powder, catalyst, rare earth polishing powder and other materials.

Production capacity: 300t/d Processed material: Silver ore Input size: 25mm Equipment: Wet grate type silver ore ball mill, wet overflow type silver ore ball mill, jaw crusher, cone crusher, flotation machine, concentrator, filter press. Auxiliary equipment: Linear vibration screen, cyclone. Request A Quote Right Now Free Solution Design: [email protected] Project Description Equipment Features Beneficiation Process

Production capacity: 1500t/d Processed material: Copper ore Input size: 25mm Equipment: 98-386t/h copper ball mill, jaw crusher, cone crusher, flotation machine, concentrator, filter press. Auxiliary equipment: Linear vibration screen, cyclone. Request A Quote Right Now Free Solution Design: [email protected] Project Description Equipment Features Beneficiation Process Project Description The 1500t/d Pakistan copper mine project uses a

Production capacity: Annual output of 300,000 tons Processed material: Soft coal Input size: 25mm Equipment: 5 sets of 20tph coal ball mill Auxiliary equipment: Desulfurization, denitrification, dust removal and other devices. Request A Quote Right Now Free Solution Design: [email protected] Project Description Equipment Features Solution Advantages Project Description The project is to build a high-efficiency

Influencing Factors of Tumbling Mill Working Capacity Tumbling mill is also known as a ball mill or rod mill. They are all composed of a cylindrical cylinder lying horizontally on the bearing, and the material is ground into powder by rotating the cylinder. When we want to discuss the factors that affect the tumbling mill

The grinding mill liners are the main wearing part of the ball mill equipment. The ball mill liner replacement should in time when the lining plate is excessively worn. Therefore, the selection and design of mill liners have always been of great concern to users. Function Design of Ball Mill Liners As one of professional

As a ball mills supplier with 22 years of experience in the grinding industry, we can provide customers with types of ball mill, vertical mill, rod mill and AG/SAG mill for grinding in a variety of industries and materials.

sorry!

sorry!

Due to network security, your access to Made-in-China.com has been temporarily denied. In order to provide a safe web service, we have to prevent abuse of Made-in-China.com by implementing necessary security measures. If you believe that your access has been wrongfully denied, Please click unlock immediately, then you can continue to visit Made-in-China.com. If you still can not access this site, please contact us immediately. Please provide details such as your access time, location, flow of site visit, Internet connection type? (dial-up, LAN, broadband) and etc.

ball mill_henan hongji mine machinery co., ltd

ball mill_henan hongji mine machinery co., ltd

The ball mill is the key equipment to crush the material after being crushed. This type of mill is equipped with a number of steel balls in its cylinder as grinding medium. When the barrel rotates, the grinding medium is attached to the wall lining of the barrel due to inertial centrifugal force. After rotating with the barrel body and reaching a certain height, the material in the barrel body will break due to gravity.

It is widely used in cement, silicate products, new building materials, refractories, fertilizers, black and non-ferrous metal beneficiation and glass and ceramics industries. It grinds various ores and other grindable materials dry or wet. Ball mill is suitable for grinding various ores and other materials. It is widely used in mineral processing, building materials and chemical industry. It can be divided into dry and wet grinding methods. According to the different ways of discharging, it can be divided into two types: grid type and overflow type.

ball mill maintenance & installation procedure

ball mill maintenance & installation procedure

Am sure your BallMill is considered the finest possible grinding mill available. As such you will find it is designed and constructed according to heavy duty specifications. It is designed along sound engineering principles with quality workmanship and materials used in the construction of the component parts. YourBallMill reflects years of advancement in grinding principles, materials, and manufacturing techniques. It has been designed with both the operators and the erectors viewpoints in mind. Long uninterrupted performance can be expected from it if the instructions covering installation and maintenance of the mill are carried out. You may be familiar with installing mills of other designs and manufacture much lighter in construction. YourBallis heavy and rugged. It should, therefore, be treated accordingly with due respect for its heavier construction.

The purpose of this manual is to assist you in the proper installation and to acquaint you a bit further with the assembly and care of this equipment. We suggest that these instructions be read carefully and reviewed by everyone whenever involved in the actual installation and operation of the mill. In reading these general instructions, you may at times feel that they cover items which are elementary and perhaps not worthy of mention; however in studying hundreds of installations, it has been found that very often minor points are overlooked due to pressure being exerted by outside influences to get the job done in a hurry. The erection phase of this mill is actually no place to attempt cost savings by taking short cuts, or by-passing some of the work. A good installation will pay dividends for many years to come by reduced maintenance cost.With the modern practice of specialized skills and trades, there is often a line drawn between responsibilities of one crew of erectors and another. Actually the responsibility of installation does not cease with the completion of one phase nor does it begin with the starting of another. Perhaps a simple rule to adopt would be DO NOT TAKE ANYTHING FOR GRANTED. This policy of rechecking previously done work will help guarantee each step of the erection and it will carefully coordinate and tie it into subsequent erection work. To clarify or illustrate this point, take the example of concrete workers completing their job and turning it over to the machinist or millwright. The latter group should carefully check the foundation for soundness and correctness prior to starting their work.

Sound planning and good judgement will, to a great extent, be instrumental in avoiding many of the troublesome occurrences especially at the beginning of operations. While it is virtually impossible to anticipate every eventuality, nevertheless it is the intention of this manual to outline a general procedure to follow in erecting the mill, and at the same time, point out some of the pitfalls which should be avoided.

Before starting the erection of the mill, adequate handling facilities should be provided or made available, bearing in mind the weights and proportions of the various parts and sub-assemblies. This information can be ascertained from the drawings and shipping papers.

The gearing, bearings, and other machined surfaces have been coated with a protective compound, and should be cleaned thoroughly with a solvent, such as Chlorothene, (made by Dow Chemical). Judgement should be exercised as to the correct time and place for cleaning the various parts. Do not permit solvents, oil or grease to come in contact with the roughened top surfaces of the concrete foundation where grouting is to be applied; otherwise proper bonding will not result.

After cleaning the various parts, the gear and pinion teeth, trunnion journals and bearings, shafting and such, should be protected against rusting or pitting as well as against damage from falling objects or weld splatter. All burrs should be carefully removed by filing or honing.

Unless otherwise arranged for, the mill has been completely assembled in our shop. Before dismantling, the closely fitted parts were match marked, and it will greatly facilitate field assembly to adhere to these match marks.

The surfaces of all connecting joints or fits, such as shell and head flanges, trunnion flanges, trunnion liner and feeder connecting joints, should be coated with a NON-SETTING elastic compound, such as Quigley O-Seal, or Permatex to insure against leakage and to assist in drawing them up tight. DO NOT USE WHITE LEAD OR GREASE.

Parts which are affected by the hand of the mill are easily identified by referring to the parts list. In general they include the feeder, feed trunnion liner, discharge trunnion liner if it is equipped with a spiral, spiral type helical splitter, and in some cases the pan liners when they are of the spiral type. When both right and left hand mills are being assembled, it is imperative that these parts which involve hand be assembled in the correct mill.

Adequate foundations for any heavy equipment, and in particular grinding mills, are extremely important to assure proper operation. The foundation should preferably be in one piece, that is, with a reinforced slab footing (so called mat) extending under both trunnion bearing foundations as well as the pinion bearing foundation. If possible or practical, it should be extended to include also the motor and drive. With this design, in the event of some movement, the mill and foundation will tend to move as a unit. ANY SLIGHT SETTLING OF FOUNDATIONS WILL CAUSE BEARING AND GEAR MISALIGNMENT, resulting in excessive wear and higher maintenance costs. It has been found that concrete foundations on a weight basis should be at least 1 times the total weight of the grinding mill with its grinding media.

Allowable bearing pressure between concrete footings and the soil upon which the foundation rests should first be considered. The center of pressure must always pass through the center of the footing. Foundations subject to shock should be designed with less unit pressure than foundations for stationary loads. High moisture content in soils reduces the amount of allowable specific pressure that the ground can support. The following figures may be used for preliminary foundation calculations.

Portland cement mixed with sand and aggregate in the proper proportions has come to be standard practice in making concrete. For general reference cement is usually shipped in sacks containing one cubic foot of material. A barrel usually holds 4 cubic feet. Cement will deteriorate with age and will quickly absorb moisture so it should be stored in a dry place. For best results the sand and gravel used should be carefully cleaned free of humus, clay, vegetal matter, etc.

Concrete may be made up in different mixtures having different proportions of sand and aggregate. These are expressed in parts for example a 1:2:4 mixture indicates one bag of cement, 2 cubic feet of sand, and 4 cubic feet of gravel. We recommend a mixture of 1:2:3 for ball mill and rod mill foundations. The proper water to sand ratio should be carefully regulated since excess water increases the shrinkage in the concrete and lends to weaken it even more than a corresponding increase in the aggregate. Between 5 to 8 gallons of water to a sack of cement is usually recommended, the lower amount to be used where higher strength is required or where the concrete will be subject to severe weathering conditions.

Detailed dimensions for the concrete foundation are covered by the foundation plan drawing submitted separately. The drawing also carries special instructions as to the allowance for grouting, steel reinforcements, pier batter, foundation bolts and pipes. During concrete work, care should be taken to prevent concrete entering the pipes, surrounding the foundations bolts, which would limit the positioning of the bolts when erecting the various assemblies. Forms should be adequately constructed and reinforced to prevent swell, particularly where clearance is critical such as at the drive end where the gear should clear the trunnion bearing and pinion bearing piers.

For convenience in maintenance, the mill foundations should be equipped with jacking piers. These will allow the lifting of one end of the mill by use of jacks in the event maintenance must be carried out under these conditions.

Adequate foundations for any heavy equipment, and in particular Marcy grinding mills, are extremely important to assure proper operation of that equipment. Any slight settling of foundations will cause bearing and gear misalignment, resulting in excessive wear and higher maintenance costs. It has been found that concrete foundations on a weight basis should be approximately 1 times the total weight of the grinding mill with its grinding media.

Allowable bearing pressure between concrete footings and the soil upon which the foundation rests should first be considered. The center of pressure must always pass through the center of the footing. Foundations subject to shock should be designed with less unit pressures than foundations for stationary loads. High moisture content in soils reduces the amount of allowable pressure that that material can support. The following figures may be used for quick foundation calculations:

Portland cement mixed with sand and aggregate in the proper proportions has come to be standard practice in making concrete. For general reference cement is usually shipped in sacks containing one cubic foot of material. A barrel usually consists of 4 cubic feet. Cement will deteriorate with age and will quickly absorb moisture so it should be stored in a cool, dry place. The sand and gravel used should be carefully cleaned for best results to be sure of minimizing the amount of sedimentation in that material.

Concrete may be made up in different mixtures having different proportions of sand and aggregate. These are expressed in parts for example a 1:2:4 mixture indicates one bag of cement, 2 cubic feet of sand, and 4 cubic feet of gravel. We recommend a mixture of 1:2:3 for ball mill and rod mill foundations. The proper water to sand ratio should be carefully regulated since excess water will tend to weaken the concrete even more than corresponding variations in other material ratios. Between 5 to 8 gallons of water to a sack of cement is usually recommended, the lower amount to be used where higher strength is required or where the concrete will be subject to severe weathering conditions.

We recommend the use of a non-shrinking grout, and preferably of the pre-mixed type, such as Embeco, made by the Master Builders Company of Cleveland, Ohio. Thoroughly clean the top surfaces of the concrete piers, and comply with the instructions of the grouting supplier.

1. Establish vertical and horizontal centerline of mill and pinion shaftagainst the effects of this, we recommend that the trunnion bearing sole plate be crowned so as to be higher at the center line of the mill. This is done by using a higher shim at the center than at the endsand tightening the foundation bolts of both ends.

After all shimming is completed, the sole plate and bases should be grouted in position. Grouting should be well tamped and should completely fill the underside of the sole plate and bases. DO NOT REMOVE THE SHIMS AFTER OR DURING GROUTING. When the grout has hardened sufficiently it is advisable to paint the top surfaces of the concrete so as to protect it against disintegration due to the absorption of oil or grease.

If it is felt that sufficient accuracy in level between trunnion bearing piers cannot be maintained, we recommend that the grouting of the sole plate under the trunnion bearing opposite the gear end be delayed until after the mill is in place. In this way, the adjustment by shimming at this end can be made later to correct for any errors in elevation. Depending on local climatic conditions, two to seven days should he allowed for the grouting to dry and set, before painting or applying further loads to the piers.

Pinion bearings are provided of either the sleeve type or anti-friction type. Twin bearing construction may use either individual sole plates or a cast common sole plate. The unit with a common sole plate is completely assembled in our shop and is ready for installation. Normal inspection and cleaning procedure should be followed. Refer to the parts list for general assembly. These units are to be permanently grouted in position and, therefore, care should be taken to assure correct alignment.

The trunnion bearing assemblies can now be mounted on their sole plates. If the bearings are of the swivel type, a heavy industrial water-proof grease should be applied to the spherical surfaces of both the swivels and the bases. Move the trunnion bearings to their approximate position by adjustment of the set screws provided for this purpose.

In the case of ball mills, all internal wearing parts will pass through the manhole, whereas in the case of open end rod mills they will pass through the discharge trunnion opening. When lining the shell, start with the odd shaped pieces around the manhole opening if manholes are furnished. Rubber shell liner backing should be used with all cast type rod mills shell liners. If the shell liners are of the step type, they should be assembled with the thin portion, or toe, as the leading edge with respect to rotation of the mill.

Lorain liners for the shell are provided with special round head bolts, with a waterproof washer and nut. All other cast type liners for the head and shell are provided with oval head bolts with a cut washer and nuts. Except when water proof washers are used, it is advisable to wrap four or five turns of candle wicking around the shank of the bolt under the cut washer. Dip the candle wicking in white lead. All liner bolt threads should be dipped in graphite and oil before assembly. All liner bolt cuts should be firmly tightened by use of a pipe extension on a wrench, or better yet, by use of a torque wrench. The bolt heads should be driven firmly into the bolt holes with a hammer.

In order to minimise the effect of pulp race, we recommend that the spaces between the ends of the shell liners and the head liners or grates be filled with suitable packing. This packing may be in the form of rubber belting, hose, rope or wood.

If adequate overhead crane facilities are available, the heads can be assembled to the shell with the flange connecting bolts drawn tightly. Furthermore, the liners can be in place, as stated above, and the gear can be mounted, as covered by separate instructions. Then the mill can be taken to its location and set in place in the trunnion bearings.

If on the other hand the handling facilities are limited it is recommended that the bare shell and heads be assembled together in a slightly higher position than normal. After the flange bolts are tightened, the mill proper should be lowered into position. Other intermediate methods may be used, depending on local conditions.

In any event, just prior to the lowering of the mill into the bearings the trunnion journal and bushing and bases should be thoroughly cleaned and greased. Care should be taken not to foul the teeth in the gear or pinion. Trunnion bearing caps should be immediately installed, although not necessarily tightened, to prevent dirt settling on the trunnions. The gear should be at least tentatively covered for protection.

IMPORTANT. Unless the millwright or operator is familiar with this type of seal, there is a tendency to assume that the oil seal is too long because of its appearance when held firmly around the trunnion. It is not the function of the brass oil seal band to provide tension for effective sealing. This is accomplished by the garter spring which is provided with the oil seal.

Assemble the oil seal with the spring in place, and with the split at the top. Encircle the oil seal with the band, keeping the blocks on the side of the bearing at or near the horizontal center line so that when in place they will fit between the two dowel pins on the bearing, which are used to prevent rotation of the seal.

Moderately tighten up the cap screws at the blocks, pulling them together to thus hold the seal with its spring in place. If the blocks cannot be pulled snuggly together, then the oil seal may be cut accordingly. Oil the trunnion surface and slide the entire seal assembly back into place against the shoulder of the bearing and finish tightening. Install the retainer ring and splash ring as shown.

In most cases the trunnion liners are already mounted in the trunnions of the mills. If not, they should be assembled with attention being given to match marks or in some cases to dowel pins which are used to locate the trunnion liners in their proper relation to other parts.

If a scoop feeder, combination drum scoop feeder or drum feeder is supplied with the mill, it should be mounted on the extended flange of the feed trunnion liner, matching the dowel pin with its respective hole. The dowel pin arrangement is provided only where there is a spiral in the feed trunnion liner. This matching is important as it fixes the relationship between the discharge from the scoop and the internal spiral of the trunnion liner. Tighten the bolts attaching the feeder to the trunnion liner evenly, all around the circle, seating the feeder tightly and squarely on its bevelled seat. Check the bolts holding the lips and other bolts that may require tightening. The beveled seat design is used primarily where a feeder is provided for the trunnion to trunnion liner connection, and the trunnion liner to feeder connection. When a feeder is not used these connecting joints are usually provided by a simple cylindrical or male and female joint.

If a spout feeder is to be used, it is generally supplied by the user, and should be mounted independently of the mill. The spout should project inside the feed trunnion liner, but must not touch the liner or spiral.

Ordinarily the feed box for a scoop tender is designed and supplied by the user. The feed box should be so constructed that it has at least 6 clearance on both sides and at the bottom of the scoop. This clearance is measured from the outside of the feed scoop.

The feed box may be constructed of 2 wood, but more often is made of 3/16 or plate steel reinforced with angles. In the larger size mills, the lower portion is sometimes made of concrete. Necessary openings should be provided for the original feed and the sand returns from the classifiers when in closed circuit.

A plate steel gear guard is furnished with the mill for safety in operation and to protect the gear and pinion from dirt or grit. As soon as the gear and pinion have been cleaned and coated with the proper lubricant, the gear guard should be assembled and set on its foundation.

Most Rod Mills are provided with a discharge housing mechanism mounted independently of the mill. This unit consists of the housing proper, plug door, plug shaft, arm, and various hinge pins and pivot and lock pins. The door mechanism is extra heavy throughout and is subject to adjustment as regard location. Place the housing proper on the foundation, level with steel shims and tighten the foundation bolts. The various parts may now be assembled to the housing proper and the door plug can be swung into place, securing it with the necessary lock pins.

After the mill has been completely assembled and aligned, the door mechanism centered and adjusted, and all clearances checked, the housing base can be grouted. The unit should be so located both vertically and horizontally so as to provide a uniform annular opening between the discharge plug door and the head liners.

In some cases because of space limitation, economy reasons, etc., the mill is not equipped with separate discharge housing. In such a case, the open end low discharge principal is accomplished by means of the same size opening through the discharge trunnion but with the plug door attached to lugs on the head liner segments or lugs on the discharge trunnion liner proper. In still other cases, it is sometimes effected by means of an arm holding the plug and mounted on a cross member which is attached to the bell of the discharge trunnion liner. In such cases as those, a light weight sheet steel discharge housing is supplied by the user to accommodate the local plant layout in conjunction with the discharge launder.

TRUNNION BEARING LUBRICATION. For the larger mills with trunnion bearings provided with oil seals, we recommend flood oil lubrication. This can be accomplished by a centralized system for two or more mills, or by an individual system for each mill. We recommend the individual system for each mill, except where six or more mills are involved, or when economy reasons may dictate otherwise.

In any event oil flow to each trunnion bearing should be between 3 to 5 gallons per minute. The oil should be adequately filtered and heaters may be used to maintain a temperature which will provide proper filtration and maintain the necessary viscosity for adequate flow. The lines leading from the filter to the bearing should be of copper tubing or pickled piping. The drain line leading from the bearings to the storage or sump tank should be of adequate size for proper flow, and they should be set at a minimum slope of per foot, perferably per foot. Avoid unnecessary elbows and fittings wherever possible. Avoid bends which create traps and which might accumulate impurities. All lines should be thoroughly cleaned and flushed with a solvent, and then blown free with air, before oil is added.

It is advisable to interlock the oil pump motor with the mill motor in such a way that the mill cannot be started until after the oil pump is operating. We recommend the use of a non-adjuslable valve at each bearing to prevent tampering.

When using the drip oil system it is advisable to place wool yarn or waste inside a canvas porous bag to prevent small pieces of the wool being drawn down into the trunnion journal. If brick grease is used, care should be taken in its selection with regard to the range of its effective temperature. In other words, it should be pointed out that brick grease is generally designed for a specific temperature range. Where the bearing temperature does not come up to the minimum temperature rating of the brick grease, the oil will not flow from it, and on the other hand if the temperature of the bearing exceeds the maximum temperature rating of the brick grease, the brick is subject to glazing; therefore, blinding off of the oil. This brick should be trimmed so that it rests freely on the trunnion journal, and does not hang up, or bind on the sides of the grease box.

When replacing the brick grease, remove the old grease completely. Due to the extended running time of brick grease, there is usually an accumulation of impurities and foreign matter on the top surface, which is detrimental to the bearing.

Where anti-friction bearings are supplied, they are adequately sealed for either grease or oil lubrication. If a flood system is used for the trunnion bearings and it is adequately filtered, it can then be used for pinion bearings with the same precautions taken as mentioned above, with a flow of to 1 gallons per minute to each bearing.

These lubricants can be applied by hand, but we highly recommend some type of spray system, whether it be automatic, semi-automatic or manually operated. It has been found that it is best to lubricate gears frequently with small quantities.

Start the lubrication system and run it for about ten minutes, adjusting the oil flow at each bearing. Check all of the bolts and nuts on the mill for tightness and remove all ladders, tools and other obstructions prior to starting the mill.

Before starting the mill, even though it is empty, we recommend that it be jogged one or two revolutions for a check as to clearance of the gear and its guard, splash rings, etc. The trunnion journal should also be checked for uniform oil film and for any evidence of foreign material which might manifest itself through the appearance of scratches on the journal. If there are any scratches, it is very possible that some foreign material such as weld splatter may have been drawn down into the bushing, and can be found imbedded there. These particles should be removed before proceeding further.

If everything is found to be satisfactory, then the mill should be run for ten to fifteen minutes, and stopped. The trunnion bearings should be checked for any undue temperature and the gear grease pattern can be observed for uniformity which would indicate correct alignment.

It should be noted that with an empty mill the reactions and operating characteristics of the bearings and gearing at this point are somewhat different than when operating with a ball or rod charge. Gear noises will be prominent and some vibration will occur due to no load and normal back-lash. Furthermore, it will be found that the mill will continue to rotate for some time after the power is shut off. Safety precautions should therefore he observed, and no work should be done on the mill until it has come to a complete stop.

We have now reached the point where a half ball or rod charge can be added, and the mill run for another six to eight hours, feeding approximately half the anticipated tonnage. The mill should now be stopped, end the gear grease pattern checked, and gear and pinion mesh corrected, if necessary, according to separate instructions.

The full charge of balls or rods can now be added, as well as the full amount of feed, and after a run of about four to six days, ALL BOLTS SHOULD AGAIN BE RETIGHTENED, and the gear and pinion checked again, and adjusted if necessary.

Where starting jacks are provided for the trunnion bearings of the larger sized mills, they should be filled with the same oil that is used for the lubrication of the trunnion bearings. Before starting the mill they should be pumped so as to insure having an oil film between the journal and the bushing.

When relining any part of the mill, clean away all sand from the parts to be relined before putting in the new liners. For the head liners and shell liners you may then proceed in the same manner used at the time of the initial assembly.

Before relining the grate type discharge head, it is advisable to refer to the assembly drawings and the parts list.Because of such limitations as the size of the manhole opening, and for various other reasons, it will be found that the center discharge liner and cone designs vary. The cone may be a separate piece or integral with either the trunnion liner, or the router discharge liner. Furthermore, it will be found in some mills that the center discharge liner is held by bolts through the discharge head, whereas in other cases it depends upon the clamping effect of grates to hold it in position. In any event, the primary thing to remember in assembling the discharge grate head parts is the fact that the grate should be first drawn up tightly towards the center discharge liner by adjusting the grate set screws located at the periphery of the discharge head. This adjustment should be carried out in progressive steps, alternating at about 180 if possible and in such a manner that, the center discharge liner does not become dislodged from its proper position at the center of the mill. These grate set screws should be adjusted with the side clamp bar bolts loosened. After the grates have been completely tightened with the set screws, check for correct and uniform position of each grate section. The side clamp bar bolts may now be lightened, again using an alternate process. This should result in the side clamp bars firmly bearing against the beveled sides of the grates. The side clamp bars should not hear against the lifter liners.

When new pan liners are installed, they should be grouted in position so as to prevent pulp race in the void space between the discharge head and the pan liner. Another good method of preventing this pulp race is the use of the sponge rubber which can be cemented in place.

After the mill is erected, in order to avoid overlooking both obvious and obscure installation details, we recommend the use of a check list. This is particularly recommended for multiple mill installations where it is difficult to control the different phases of installation for each and every mill. Such a check list can be modeled after the following:

No. 1 Connecting Bolts drawn tight. A. Head and Shell flange bolts. B. Gear Connecting, bolts. No. 2 Trunnion studs or bolts drawn up tight. No. 3 Trunnion liner and feeder connecting bolts or studs drawn up tight. No. 4 Feeder lip bolts tightened. No. 5 Liner bolts drawn up tight. No. 6 Gear. A. Concentric B. Backlash C. Runout D. Joint bolts drawn up tight. No. 7 Coupling and Drive alignment and lubrication. No. 8 Bearings and Gearing cleaned and lubricated. No. 9 Lubrication system in working order with automatic devices including alarms and interlocking systems.

We further recommend that during the first thirty to sixty days of operation, particular attention be given to bolt tightness, foundation settlement and condition of the grouting. We suggest any unusual occurrence be recorded so that should trouble develop later there may be a clue which would simplify diagnosing and rectifying the situation.

As a safety precaution, and in many cases in order to comply with local safety regulations, guards should be used to protect the operators and mechanics from contact with moving parts. However, these guards should not be of such a design that will prevent or hinder the close inspection of the vital parts. Frequent inspection should be made at regular intervals with particular attention being given to the condition of the wearing parts in the mill. In this way, you will be better able to anticipate your needs for liners and other parts in time to comply with the current delivery schedules.

When ordering repair or replacement parts for your mill, be sure to identify the parts with the number and description as shown on the repair parts list, and specify the hand and serial number of the mill.

By following the instructions outlined in this manual, mechanical malfunctions will be eliminated. However, inadvertent errors may occur even under, the most careful supervision. With this in mind, it is possible that some difficulties may arise. Whenever any abnormal mechanical reactions are found, invariably they can be attributed to causes which though sometimes obvious are often hidden. We sight herewith the most common problems, with their solutions.

Cause A GROUT DISINTEGRATION. Very often when the grouting is not up to specification the vibration from the mill tends to disintegrate the grouting. In most instances the disintegration starts between the sole plate and the top surface of the grouting near or at the vertical centerline of the mill. As this continues, the weight of the mill causes the sole plate and trunnion bearing base to bend with a resultant pinching action at the side of the bearing near the horizontal center line of the mill. This pinching will cut off and wipe the oil film from the journal and will manifest itself in the same manner as if the lubrication supply had been cut off. If the grout disintegration is limited to about . 050 and does not appear to be progressing further, the situation can be corrected by applying a corresponding amount of shimming between the trunnion bearing base and the sole plate near the centerline of the mill in such a fashion that the trunnion bearing base has been returned to its normal dimensional position. If, on the other hand, the grouting is in excess of . 050 and appears to be progressing further, it is advisable to shut down operations until the sole plate has been re grouted.

Cause B HIGH SPOT ON THE BUSHING. While all BallMill bushings are scraped in the shop to fit either a jig mandrel or the head proper to which it is to be fitted, nevertheless there is a certain amount of seasoning and dimensional change which goes on in the type of metals used. Therefore if high spots are found, the mill should be raised, the bushings removed and rescraped. Bluing may be used to assist in detecting high spots.

Cause C INSUFFICIENT OIL FLOW. Increase the oil supply if it is a flood oil system. If brick grease is used, it is possible that the particular grade of brick may not be applicable to the actual bearing temperature. Refer to the remarks in this manual under the paragraph entitled Lubrication.

Cause E EXCESSIVE RUBBING ON THE SIDE OF THE BUSHING. This comes about due to the improper setting of the bearings in the longitudinal plane. In some cases, particularly on dry grinding or hot clinker grinding mills, the expansion of the mills proper may account for this condition. In any event, it can be remedied by re-adjusting the bearing base on the sole plate longitudinally at the end opposite the drive.

There are many more lubricant suppliers, such as E. F. Houghton and Co. , or Lubriplate Division of Fiske Bros. Refining Co. In making your final selection of lubricants, you should consider the actual plant conditions as well as the standardization of lubricants. New and improved lubricants are being marketed, and we, therefore, suggest that you consult your local suppliers.

energy efficient cement ball mill from flsmidth

energy efficient cement ball mill from flsmidth

You decide whether to operate the mill in open or closed circuit, with or without a pre-grinder and with side or central drive, according to your plant layout and end product specifications. Even the lining types are tailored to your operating parameters.

In addition, the large through-flow areas enable the mill to operate with large volumes of venting air and a low pressure drop across the mill. This reduces the energy consumption of the mill ventilation fan and keeps your energy costs down.

The mill is based on standard modules and can be adapted to your plant layout, end product specifications and drive type. The horizontal slide shoe bearing design enables much simpler foundations and reduced installation height, making installation quicker and less expensive.

Our shell linings are designed to suit the task at hand. In our two-compartment cement mills, the first compartment (for coarse grinding) has a step lining suitable for large grinding media. It protects the shell while ensuring optimum lifting of the mill charge. In the second compartment (and also in our one-compartment cement mills) we use a corrugated lining designed to obtain the maximum power absorption and grinding efficiency. For special applications, we can supply a classifying shell lining for fine grinding in the mill.

In fact, the entire mill is protected with bolted on lining plates designed for the specific wear faced by each part of the mill. This attention to detail ensures both minimal wear and easy maintenance. When a wear part has reached the end of its life, it is easily replaced.

The grinding media are supplied in various sizes to ensure optimum grinding efficiency. The STANEX diaphragm is designed to maximise the effective grinding area, enabling a higher throughput. It is fitted with adjustable lifters to ensure the material levels in each compartment are right. Best of all, the STANEX diaphragm works for all applications, even when material flow rates are high and the mill feed is moist.

The mills are typically driven by our FLSmidth MAAG LGDX side drive - gearing rated to the latest proven AGMA standards. The mill drive is provided with an auxiliary drive for slow turning of the mill. The LGDX includes two independent lubrication systems, one which services the girth gear guard and intakes more dust, and a second which supplies oil for the fast-rotating gearing and bearings and stays clean. If requested, however, the mills can be provided with a central drive: the FLSmidth MAAG CPU planetary gearbox. The mill design differs slightly, depending on whether the side or central drive is chosen.

Each grinding compartment has two man-hole covers to give easy access for maintenance. As there are minimal moving parts, the maintenance requirement is low and simple changes like replacing wear linings and topping up grinding media can be completed quickly and easily. Horizontal slide shoe bearings prevent oil spillages from the casing and offers easy replacement of slide shoes.

Buying a new mill is a huge investment. With over a century of ball mill experience and more than 4000 installations worldwide, rest assured we have the expertise to deliver the right solution for your project. Our ball mill is based on standard modules and the highly flexible design can be adapted to your requirements. The mill comprises the following parts.

The mill body consists of an all-welded mill shell and a T-sectional welded-up slide ring at either end, the cylindrical part of which is welded onto the ends of the shell. The mill shell has four manholes, two for each grinding compartment.

Each slide ring runs in a bearing with two self-aligning and hydrodynamically lubricated slide shoes. One of the slide shoes at the drive end holds the mill in axial direction. In the others, the slide rings can move freely in axial direction to allow for longitudinal thermal expansion and contraction of the mill body.

The slide shoes are water-cooled, and each bearing is provided with a panel-enclosed lubrication unit including oil tank, motorised low- and high-pressure oil pumps, as well as an oil conditioning circuit with motorised pump for heating/cooling and filtration of the oil.

The stationary steel plate inlet duct leads the venting air into the mill. It is equipped with a manually operated throttle valve and a pressure monitor to adjust the pressure at the inlet end, thus preventing dust emission from the inlet. The feed chute is lined with bolted-on wear plates and slopes down through the air duct to the mill inlet opening.

The more control you have over the mill, the better your grinding efficiency is likely to be. Our ball mills include monitoring systems to continuously measure the material and air temperatures as well as the pressure at the mill exit. The venting of the mill is adjusted by a damper in the inlet to the mill fan. And the material fill level is continuously monitored by means of sensors. For ball mills operating in closed circuit, the circulation load is monitored by weighing the flow of reject material from the separator. These measures ensure you achieve optimum mill performance, giving you the quality, efficiency, safetyand reliability that you need.

FLSmidth provides sustainable productivity to the global mining and cement industries. We deliver market-leading engineering, equipment and service solutions that enable our customers to improve performance, drive down costs and reduce environmental impact. Our operations span the globe and we are close to 10,200 employees, present in more than 60 countries. In 2020, FLSmidth generated revenue of DKK 16.4 billion. MissionZero is our sustainability ambition towards zero emissions in mining and cement by 2030.

china cement ball mill manufacturers and factory, suppliers | zhengyuan

china cement ball mill manufacturers and factory, suppliers | zhengyuan

Our enterprise since its inception, usually regards product top quality as business life, repeatedly enhance manufacturing technology, make improvements to product excellent and continuously strengthen enterprise total high quality administration, in strict accordance with all the national standard ISO 9001:2000 for Cement Ball Mill, Jet Mill Micronizer , , Ultrafine Grinder ,Disaggregate Mill . We've been willing to provide you with the lowest selling price during the market place, greatest high quality and quite nice sales service.Welcome to do bussines with us,let's be double win. The product will supply to all over the world, such as Europe, America, Australia,Peru , Holland ,Sudan , Canada .because of our company has been persisting in the management idea of "Survival by Quality, Development by Service, Benefit by Reputation" . We fully realize the good credit standing, the high quality products, the reasonable price and the professional services are the reason that the customers choose us to be their long-term business partner.

cement raw mill in cement plant for cement raw meal grinding

cement raw mill in cement plant for cement raw meal grinding

Applications: It widely used in cement production, silicate products, new building materials, ferrous and nonferrous metal processing, electric power, ceramics and other industries of material grinding.

Raw mill is also called cement raw mill, similar tocement ball mill, it is an importantcement milling equipment used in the cement production process.Raw mill is mainly used for grinding cement raw meal in the cement factory production process. It is also suitable for metallurgical, chemical, electric power and other industrial mining enterprises to grind various ores and other grindable materials.

Cement raw meal is a mixture of various raw materials before cement calcination. It is a mixture of lime raw material (mainly composed of calcium carbonate), clay raw material (aluminosilicate containing alkali and alkali soil) and a small amount of calibration raw material in a certain proportion and ground to a certain fineness. In order to meet the success of the subsequent calcination process, the grinding of the raw meal must be uniform in fineness and ensure the chemical composition of the mixture is stable.

Raw mill in cement plant is very suitable for cement raw meal grinding because of its strong adaptability to raw materials and adjustable grinding fineness. It is the most commonly used grinding machine in the grinding stage of raw materials in the cement plant.

The cement raw mill is generally cylindrical in the horizontal direction, and gears are driven at both ends. After the motor is turned on, the cylinder is rotated. Raw materials are evenly fed into the first inner silo from the feed port at one end. The inner wall of the silo is provided with a step liner or a corrugated liner, and steel balls of different specifications are installed inside as the grinding media.

When the raw material grinding process starts, with the rotation of the cylinder body, the steel balls and materials are brought to a certain height and then fall down, so that the reciprocating cycle can produce impact and grind on the materials. Material is ground at the primary stage in the first inner silo to achieve rough grinding size. After that, the material passes through the single-layer partition board to enter the second inner silo for further grinding.

The inner wall of the second inner silo is a flat liner plate. The number of steel balls is more and the size is smaller than that of the first inner silo. The grinding of materials is more sufficient. In the raw mill grinding process, the grinding material is discharged from the grinder through the discharge hole, and the fineness of the qualified material is sorted by the sorting equipment, while the fineness of the unqualified material is sent back to the cement raw mill by the sorting machine. And unqualified material will be ground until the fineness meets the requirements.

As a ball mills supplier with 22 years of experience in the grinding industry, we can provide customers with types of ball mill, vertical mill, rod mill and AG/SAG mill for grinding in a variety of industries and materials.

large ball mill for large scale mining and cement plants

large ball mill for large scale mining and cement plants

A large ball mill is known for its large processing capacity and long daily operation time, so it is also called a large scale ball mill or large capacity ball mill. The large ball mill is especially suitable for large-scale grinding production. It adopts two bin grinding, which is more energy-saving and environmental protection. The large scale ball mill adopts the horizontal cylindrical rotating structure, and the appearance design is more reasonable.

After the upgrade of new components, the material of large ball mills and the performance of internal wearing parts have been further improved, with more reliable grinding performance. Large capacity ball mills are common in large-scale mineral processing production lines and big cement plants, with more economic benefits.

The grinding process is the main link of electrical energy consumption in the entire grinding production line. The grinding operation has the characteristics of large installation power and high energy consumption, and ultimately determines the energy consumption of the entire production line.

Taking a large-scale beneficiation plant as an example, as the mining continues to deepen, the grade of the original ore continues to decline, and the processing capacity of the grinding operation also increases. At this time, it is necessary to increase the production capacity of theball mill machine. If the number ofore ball millequipmentis increased, it will lead to an increase in floor space, and the grinding production process will become complicated. This will lead to problems such as complicated operation and management, increased auxiliary equipment, and increased capital investment.

The use of big ball mill can also reduce the floor area of the equipment, simplify the process, facilitate the management and maintenance, and facilitate the automatic management of the process. In large-scale grinding operations, the use of big ball mill has reduced the cost of beneficiation, making some low-grade ore once used, which is conducive to the comprehensive utilization of resources, so it is favored by large-scale beneficiation plants and cement plants.

As a ball mills supplier with 22 years of experience in the grinding industry, we can provide customers with types of ball mill, vertical mill, rod mill and AG/SAG mill for grinding in a variety of industries and materials.

Get in Touch with Mechanic
Related Products
Recent Posts
  1. ball mill for fat china

  2. rod mill charging

  3. ceramic ball mill 80%

  4. system sand production line 9 schedule

  5. ceramic ball mill machine

  6. ball krishna agarwal dal mill

  7. feldspar lumps bauxite ball mill

  8. ball mills south africa

  9. quartz mining wet ball mill quartz mining growing

  10. sops for ball mill equepments

  11. joyal china good quality basalt raymond mill stone mill grinder

  12. industrial x-ray equipment

  13. hammer meel 4 sale

  14. 2 vacuum drum filter for mining

  15. stone crusher machine for mining to crush hard rock

  16. sand making machine learning

  17. mining machine making process

  18. sandvi hammer mills

  19. crusher work asindex tests

  20. low price 3 pass rotary dryer for silica sand